Certifications

GPG certifies two facilities

We would like to congratulate the Torito hydropower plant (Costa Rica) and the Bii Hioxo wind farm (México) on the ISO 9001:2015, ISO 14001:2015 and OHSAS 18001:2007 certifications that they have received after passing an audit by the Spanish Association for Standardisation (AENOR) in 2019.

Costa Rica

Torito inauguration

The President of Costa Rica, Luis Guillermo Solís, and the CEO of GAS NATURAL FENOSA, Salvador Gabarró, inaugurated the Torito Hydroelectric Power Plant, which has an installed capacity of 50 megawatts (MW) and will be operated by the Spanish multinational energy company for a period of 20 years through its subsidiary Global Power Generation (GPG).