Home / Geographical presence / Projects in Costa Rica
Projects in Costa Rica
Torito hydraulic power plant
Torito began operations on 24 April 2015 and is located in the north-east of the country. It will use turbinated water from the river Reventazón previously used by Angostura, without having to flood any areas.
The plant has a power output of 50 MW from two Francis-type turbines connected to two 37.5 MVA generators.









