Torito hydraulic power plant

Torito began operations on 24 April 2015 and is located in the north-east of the country. It will use turbinated water from the river Reventazón previously used by Angostura, without having to flood any areas.

The plant has a power output of 50 MW from two Francis-type turbines connected to two 37.5 MVA generators.

/
/
/
/
Inauguration

GPG inaugurated Torito in November 2015