
Their great flexibility and low emissions make this technology essential for ensuring the implementation of renewable generation.

Projects in operation
Mexico
CCC Hermosillo
- Installed capacity: 283.5 MW
- Location: Hermosillo, Sonora
- In operation: since 2001
CCC Naco nogales
- Installed capacity: 364 MW
- Location: Agua Prieta, Sonora
- In operation: since 2003
CCC Tuxpan III & IV
- Installed capacity: 1,180 MW
- Location: Veracruz, Tuxpan
- In operation: since 2003
CCC Norte Durango
- Installed capacity: 570 MW
- Location: Victoria de Durango
- In operation: since 2010
Puerto Rico
CCC EcoEléctrica
- Installed capacity: 540 MW
- Location: Punta Guayanilla en Peñuelas
- In operation: since 2000
O&M
Mexico
CCC La Caridad
- Installed capacity: 516 MW
- Location: Nacozarí de Garcia, Sonora
- In operation: since 2013
Project portfolio
