Projects in operation

Costa Rica

Hydraulic plant Torito
  • Installed capacity: 50 MW
  • Location: Turrialba, province of Cartago
  • In operation: since 2015
Hidraulic plant La Joya *
  • Installed capacity: 50 MW
  • Location: Turrialba, province of Cartago
  • In operation: since 2006 until 2023
 

*In July 2023, the plant was transferred to ICE at the end of the concession period.

Panama

Hydraulic plant Algarrobos
  • Installed capacity: 9.96 MW
  • Location: province of Chiriquí
  • In operation: since 2006
Hydraulic plant Dolega
  • Installed capacity: 3 MW
  • Location: province of Chiriquí
  • In operation: since 2001
 
 
Hydraulic plant Yeguada
  • Installed capacity: 6.6 MW
  • Location: province of Veraguas
  • In operation: since 1967
Hydraulic plant Macho de Monte
  • Installed capacity: 2.5 MW
  • Location: province of Chiriquí
  • In operation: since 2001

The Panamá plants are operated remotely from the hydraulic plant Dolega.

O&M

Uganda

Hydraulic plant Bujagali *
  • Installed capacity: 250 MW
  • Location: Njeru, Buikwe
  • In operation: since 2012
Hydraulic plant Achwa II *
  • Installed capacity: 82 MW (41 MW in each power plant)
  • Location: Angagura, Pader-Gulu
  • In operation: since 2019

*Services provided since 2011 until 2022