Projects in operation
Costa Rica
Hydraulic plant Torito
- Installed capacity: 50 MW
- Location: Turrialba, province of Cartago
- In operation: since 2015
Hidraulic plant La Joya *
- Installed capacity: 50 MW
- Location: Turrialba, province of Cartago
- In operation: since 2006 until 2023
*In July 2023, the plant was transferred to ICE at the end of the concession period.
Panama
Hydraulic plant Algarrobos
- Installed capacity: 9.96 MW
- Location: province of Chiriquí
- In operation: since 2006
Hydraulic plant Dolega
- Installed capacity: 3 MW
- Location: province of Chiriquí
- In operation: since 2001
Hydraulic plant Yeguada
- Installed capacity: 6.6 MW
- Location: province of Veraguas
- In operation: since 1967
Hydraulic plant Macho de Monte
- Installed capacity: 2.5 MW
- Location: province of Chiriquí
- In operation: since 2001
The Panamá plants are operated remotely from the hydraulic plant Dolega.
O&M
Uganda
Hydraulic plant Bujagali *
- Installed capacity: 250 MW
- Location: Njeru, Buikwe
- In operation: since 2012
Hydraulic plant Achwa II *
- Installed capacity: 82 MW (41 MW in each power plant)
- Location: Angagura, Pader-Gulu
- In operation: since 2019
*Services provided since 2011 until 2022